Monday, 15 June 2009

Week seven 30.05.09-06.06.09

Volunteers involved:

Elaine Sutcliff (Manchester)
Alison Patey (Southampton)
(Simon Costin also arrived!)

What was the aim for the week?
· Foundations
· Drainage
· Concrete works

What was achieved in the week?
· Creosoted formwork
· Continued preparation of trenches
· Protected setting posts from termites with paint
· Sieved sand for stabilized soil blocks
· Leveling of kitchen area began.






Elaine “the most rewarding blisters I have ever had!”

Alison “the Dwabor KG project was a challenging yet rewarding experience and the best way to sweat off those love handles!”